ENSTA GROUP builds on the work of a team developing water infrastructure since 2006. We manufacture drinking fountains, install water treatment and disinfection systems, and provide ongoing maintenance.

CURRENT OPERATIONS

Manufacturing, installation and maintenance

We design and manufacture equipment, install it and maintain it throughout its service life. This experience comes from our work with Kyiv’s educational facilities and water infrastructure.

Established in 2026, ENSTA GROUP LLC is the next corporate stage for a team working in water infrastructure since 2006. It brings together the team’s product development, manufacturing expertise, city programmes and maintenance operations.

20 years of water infrastructure experience

DEVELOPMENT

Products and technologies

We develop drinking fountains, beach showers and water treatment equipment. ENSTA GP gypsum-perlite panels form a separate range for the rapid installation of non-load-bearing walls and partitions.

Development programme

OUR TEAM’S HISTORY

20 years in water infrastructure

The 2006 initiative

Our team initiated Kyiv’s drinking water programme for educational facilities. Delivery covered equipment design and manufacturing, installation of treatment systems and fountains, commissioning and scheduled maintenance.

The first large-scale city programme

This was Ukraine’s first large-scale city programme of its kind. Our team was the first in Ukraine to develop and manufacture drinking fountains for educational facilities and public spaces, later adding its own beach shower systems.

RESULTS

Installed equipment

Equipment installed by our team over the course of Kyiv’s education programme.

≈600educational facilities
≈800water treatment systems
≈2 400drinking fountains installed
≈300 000children given access to clean drinking water

Key milestones

  1. 2006

    A city programme begins

    Initiation and delivery of Kyiv’s drinking water programme for educational facilities.

  2. Expansion

    Manufacturing and rollout

    In-house design, manufacturing, installation and maintenance: around 800 treatment systems and 2,400 drinking fountains.

  3. Public spaces

    Parks and recreation

    Fountains for parks and leisure areas, alongside the development and manufacture of beach showers.

  4. 2022

    Potential emergency water supply

    Keeping equipment operational and assessing the network as potential emergency drinking water points.

  5. 2026 →

    ENSTA GROUP

    A new corporate stage for the team: equipment, maintenance, city programmes and ENSTA GP building solutions.

2022

Drinking water access during disruption

Treatment systems and fountains distributed across city districts provide additional drinking water access points. This infrastructure is particularly valuable during prolonged disruption to normal supply arrangements, as in 2022.

Where water supply and power remain available, installed equipment can supplement emergency provision. The city can organise access to existing treatment and dispensing points across its facilities.

Calculated capacity of the installed network

Calculated peak capacity
≈944 000 L/h
Combined filtration resource before scheduled media replacement
≈88 million L

Combined nameplate capacity: around 800,000 L/h from treatment systems and 144,000 L/h from fountains. Their filtration resources total 64 million and 24 million litres respectively.