Treatment systems and fountains distributed across city districts provide additional drinking water access points. This infrastructure is particularly valuable during prolonged disruption to normal supply arrangements, as in 2022.
Where water supply and power remain available, installed equipment can supplement emergency provision. The city can organise access to existing treatment and dispensing points across its facilities.
Calculated capacity of the installed network
- Calculated peak capacity
- ≈944 000 L/h
- Combined filtration resource before scheduled media replacement
- ≈88 million L
Combined nameplate capacity: around 800,000 L/h from treatment systems and 144,000 L/h from fountains. Their filtration resources total 64 million and 24 million litres respectively.